The pontoon installed above the excavation zone is the relay point between the deposit and the land base; it is essential for the safety of the divers (in red in the water). The zone is delimited by fixed triangles with 5m sides (visible in the picture) that are necessary to identify the vestiges.
Subaquatic excavations
The excavation work is done bare-handedly,
without any instruments. All the sediments making up the occupation layers are carefully collected and then placed in a bucket marked with the layer number and the number of a small triangle with 1m sides, delimited by strings, in order to correctly identify its origin in the deposit.
Page 4 / 55
Under water...
The exploitation of a subaquatic archaeological deposit halving:
- Under the water where vestiges and sediments are extracted
- On a ground base where installations allow to sort out, to stand out, restore, package objects and where put themselves in the net the plans being raised(found) and the seizure of the data. - sur une base terrestre où des installations permettent de trier, marquer, restaurer, conditionner les objets et où se mettent au net les plans relevés et la saisie des données.
On the ground base...
Reception of buckets full of restes
Sieving and recovery of the remains

Being put the plans and the statements neatly

To print
To print